fbpx
Daily Current Affairs for UPSC

Flood Forecasting in India: Strengthening Centre–State Coordination

Syllabus- Disaster Management [GS Paper-3]

Image Credit: IANS

Context

Central Water Commission (CWC) held a One-Day Stakeholders Workshop on Flood Forecasting Services and Flood Management DPR Guidelines in New Delhi.

Key Highlights

  • There is a growing rate and severity of floods in India caused by climatic variations, heavy precipitation, melting ice sheets, and unplanned urbanisation.
  • The workshop was conducted within the Ministry of Jal Shakti with focus on CentreState coordination to withstand disasters.

Objectives of the Workshop

  • Enhancing the flood forecasting, preparedness and response systems in India.
  • Improving quality, appraisal and execution of Flood Management Detailed Project Reports (DPRs).
  • Pushing the use of technology, real time data exchange and decision support systems.

Broad-Based Participation and Institutional Coordination

  • Involvement of 27 States/UTs and 15 Central agencies and approximately 173 officers.
  • Key institutions included:
    • Indian Meteorological Agency (IMD).
    • National Disaster Management Authority (NDMA).
    • National Disaster Response Force (NDRF).
    • National Corporation of Remote Sensing (NRSC)
    • National Dam Safety Authority (NDSA)
  • This is an indication of a whole-of-government solution to flood management.

Development of Flood Forecasting Services in India

  • Presentation on CWC showed progressive development of flood forecasting including:
    • Short-range advisory flood forecasts and seven-day advisory flood forecasts.
    • Inundation prediction to impact-based decision-making.
    • Combined reservoir operation information systems.
    • Studies and monitoring of glacial Lake Outburst Flood (GLOF).
    • AI/ML use, 4-week flood guidance, and flash flood forecasting.
  • The shift is a change between the event based forecasting and the impact based forecasting.

State-Level Experiences and Best Practices

  • Field level experience was shared between such states as Assam, Bihar, Odisha, Uttar Pradesh, Tamil Nadu, and Telangana.
  • Key insights included:
    • Significance of operational liaison with CWC.
    • Difficulties in last-mile warnings distribution.
    • Merit of automation and real time data sharing.
  • States were demanding more synergy and technical assistance by central agencies.

DPR Guidelines and Flood Management Planning

  • The afternoon session involved preparation, submission and appraisal of Flood Management DPRs.
  • Key emphasis areas included:
    • Regional planning rather than single-project planning.
    • Strong hydrological and technical examination.
    • Early interaction with CWC in order to eliminate appraisal delays.
  • CWC explained:
    • Common deficiencies in DPRs
    • Submission online on e-PAMS portal.
    • Schemes such as FMBAP appraisal timelines and processes of central assistance.

Way Forward

  • Turn real-time data sharing between Centre and States into institutionalisation.
  • Extend impact-based forecasting and decision systems to the district.
  • Whether it is regular technical workshops or capacity-building programmes, do them regularly to States.
  • Enhance the quality and timeliness of DPRs in order to implement a project faster.
  • Make flood management consistent with the climate-resilient water resources planning.

Conclusion

  • Flood control in India needs to have cooperative federalism, scientific planning, and integration of technology.
  • The CWC workshop highlights the importance of utilizing collaborative governance and capacity building to mitigate risk of floods.
  • Concrete prediction and enhanced planning of projects are also essential to disaster resilience and life-saving.

Source: The PIB

Mains PYQ

(Q) The interlinking of rivers can provide viable solutions to the multi-dimensional inter-related problems of droughts, floods, and interrupted navigation. Critically examine. (2020)

  • Workshop CWC was devoted to the forecasting of floods and the quality of DPR.
  • Involvement of 27 States/UTs and several central agencies.
  • Focus on impact-based forecasting and AI-based systems.
  • Requirement of basin level planning and preliminary technical interaction.
  • Co-ordinated Centre-State is the important aspect of flood control that is climate-resilient.
image_pdfDownload as PDF
Alt Text Alt Text

    Image Description





    Related Articles

    Back to top button
    Shopping cart0
    There are no products in the cart!
    0